Our News
Development Authority of the North Country Army Water Line Valve Replacement
Jan 04, 2023
EDR was contracted to perform study, design, and construction phase services for the replacement of 17 valves along the 20-inch water line that serves Fort Drum. Fort Drum’s water is supplied through an 11-mile, 20-inch water line that carries treated drinking water from the City of Watertown to Fort Drum. The water line was placed […]