Our News

Project Approval Ohio

Congratulations to Apex Clean Energy on Approval from the OPSB

EDR congratulates Apex Clean Energy on the recent Ohio Power Siting Board (OPSB) approval of their Wheatsborough Solar Project in Groton Township, Erie County, Ohio. The 125 megawatt (MW) project, which will consist of solar panel arrays as well as a 50 MW battery energy storage system, will be able to produce enough power to supply […]

Read more »


BOEM issues Notice of Intent (NOI) for Atlantic Shores

EDR congratulates the Atlantic Shores Offshore Wind Team on the announcement from the U.S. Bureau of Ocean Energy Management (BOEM) issuing the Notice of Intent (NOI) in the Federal Register to prepare an Environmental Impact Statement (EIS) for the review of the Atlantic Shores Construction and Operations Plan (COP). The Projects include developing two offshore wind […]

Read more »


EDR Columbus Ohio

EDR Opens Midwest Office in Downtown Columbus Ohio

EDR is pleased to announce the grand opening of their Midwest office in downtown Columbus. EDR has provided professional services in Ohio for well over a decade leading Ohio Power Siting Board (OPSB) permitting efforts, including the preparation of environmental studies such as visual impact assessments, planting/screening plans, socioeconomic evaluations, glare assessments, vegetation management plans, […]

Read more »


Odor Control for Rockland County Sewer District: A Better Environment

EDR is thrilled to be part of the Design-Build team selected by Rockland County Sewer District to provide engineering services for the 13 odor control systems at the District’s 29mgd wastewater treatment plant in Orangeburg, NY. The EDR team includes national experts for odor control sampling and establishing project design criteria. The 13 systems will utilize […]

Read more »


Cultural Resource Managment

EDR Welcomes Dan Forrest to Cultural Resources and Offshore Wind Team

EDR is pleased to announce the recent addition of Daniel Forrest as Cultural Resources Practice Leader – Offshore Wind & New England.  In this role, Dan will serve as EDR’s technical lead for Section 106 of the National Historic Preservation Act consultation and cultural resources studies for offshore wind energy clients and projects, as well […]

Read more »


NYS 94-C Consultant

First Projects Approved by New York’s Office of Renewable Energy Siting

EDR congratulates AES Clean Energy and EDF Renewables for receiving the first-ever Siting Permits for a Major Renewable Energy Facility, issued by the New York State Office of Renewable Energy Siting (ORES). AES Clean Energy’s Riverhead Solar 2 Project is a 36-megawatt solar facility to be constructed and operated in the Town of Riverhead, in […]

Read more »


GIS Firm

EDR Welcomes New GIS Staff

EDR is pleased to announce the addition of Ben Rozwod and Madison Duncan to the firm’s GIS practice group. Ben Rozwod joins the firm as a GIS Technician. He is a recent GIS graduate from SUNY Cortland and a Syracuse area native. His previous experience includes responsibility for collecting various GPS points, assisting with mapping […]

Read more »


Professional Engineer

EDR Engineers Earn Profession Engineer Accreditation

Congratulations to Senior Project Engineer Justin Chiera and Design Engineer Abby Doyle on passing the New York State Professional Engineering Exam. Justin Chiera, PE earned a Bachelor of Science in Civil Engineering from the L.C. Smith College of Engineering and Computer Science at Syracuse University and a Master of Business Administration, Finance from Syracuse University.  […]

Read more »


1 4 5 6 7 8 30